Quality / compliance / traceability
The release is part of the product.
A thermal unit is only as good as the record that travels with it. Novaryn controls design inputs, material traceability, fabrication, testing and release through one quality file.
- Quality system
- ISO 9001:2015
- Pressure equipment
- ASME U / U2 / S · PED H
- Traceability
- EN 10204 3.1
- Release
- Project ITP

Certifications
The approvals behind the nameplate.
Certification scope follows the equipment family, pressure class and project specification. The table shows the current system approvals; the order certificate names the exact scope.
| Approval | Scope | Body | Status | Record |
|---|---|---|---|---|
| ISO 9001:2015 | Quality management system | LRQA | Current | Request |
| ISO 14001:2015 | Environmental management | LRQA | Current | Request |
| PED 2014/68/EU | Pressure equipment — Module H | TÜV | Current | Request |
| ASME U / U2 | Pressure vessels — Div. 1 and Div. 2 | ASME | Current | Request |
| ASME S | Power boilers | ASME | Current | Request |
| IEC 60076-7 | Transformer cooling qualification | Internal | Tested | Request |
Quality gates
Five gates. No silent handovers.
Each gate has a defined output and a named owner. The project quality plan can add witness points, hold points and third-party inspection without changing the sequence.
Quality policy
Build the equipment and the record together. No release without traceability; no shipment without the controlling revision.
Design input review
Duty point, media, design conditions, standards, interfaces and document requirements are checked before engineering release.
Output
Reviewed basis of design
Material control
Heat-number traceability, mill certificates, incoming inspection and material segregation against the bill of materials.
Output
EN 10204 3.1 file
Fabrication control
Welder qualification, WPS/PQR, dimensional checks, NDT and hold points recorded against the inspection plan.
Output
Signed ITP
Test & release
Pressure test, leak test, performance check where applicable and final inspection before the release certificate.
Output
Test records + certificate
Project handover
As-built drawings, manuals, spare list, material reports and digital record indexed to the serial number.
Output
Handover dossier
Inspection & test
What we verify, and how.
The test regime is selected from the pressure class, media, standard and project specification. Additional witness, NDT or performance testing is quoted against the inspection plan.
01
Hydrostatic / pneumatic test
Pressure test at the specified test pressure, with hold time, water quality and drying route recorded against the unit.
Pressure test certificate
02
Helium / trace leak test
Helium or tracer-gas leak testing for refrigerant, hydrogen, cryogenic and high-integrity circuits.
Leak test record
03
Non-destructive examination
Dye penetrant, magnetic particle, ultrasonic or radiographic examination selected by joint type and specification.
NDT report
04
Dimensional inspection
Envelope, nozzle orientation, connection sizes, lifting points and interface dimensions checked against the GA drawing.
Dimensional report
05
Performance verification
Where the contract requires it, thermal performance is verified from the test data or a witnessed factory run.
Performance test report
06
Final inspection & release
Painting, tagging, preservation, packing and document completeness checked before the release certificate is signed.
Release certificate
Traceability
Every pressure boundary has a heat number.
Material certificates are matched to the bill of materials, the purchase order and the serial number. The file can be searched by heat number, component or drawing revision.
- Mill certificates to EN 10204 3.1
- Heat-number mapping to pressure-retaining parts
- NACE MR0175 review for sour service
- PMI verification on selected alloys
- Serial-number indexed handover dossier

Inspection / material verification
Records are reviewed before the unit enters the release queue.
Quality / project
Add the quality plan to the enquiry.
Tell us the applicable standard, inspection class, witness requirements, material certification and any third-party review. The quotation will carry the inspection plan and document schedule.