NOVARYNINDUSTRIAL LIMITED

Gas separation / cooled fin surfaces

Desublimators

Batch desublimation units for separating valuable or hazardous components from gas streams by controlled cooling and warming.

Family
Process transfer
Series
3
Core standards
ASME VIII Div. 1 / Div. 2 · TEMA R / C / B
Document set
3 records
Desublimators — representative Novaryn equipment
Novaryn equipment referenceTX / US

Product overview

Novaryn desublimators are framed for chemical and pharmaceutical processes, tank venting, and vacuum protection where a component must crystallize out of a gas stream and later be recovered.

Planning reference

Process
Cooling and heating batch operation
Capture mode
Crystallization on cooled fins
Use case
Product recovery or emissions protection

Representative summary. Project duty, materials and certification are confirmed at selection.

Specification framework

Standards, materials and the conditions that shape the unit.

The framework below is common to this line. It is not a substitute for a project datasheet: the final pressure class, material schedule, connection detail and test regime are fixed against the duty point.

01

Design standards

  • ASME VIII Div. 1 / Div. 2
  • TEMA R / C / B
  • API 660
  • API 661

02

Material scope

  • 316L stainless
  • Duplex 2205
  • Titanium
  • Nickel alloys
  • Carbon steel

03

Selection inputs

  • Media and flow rate
  • Inlet / outlet temperature
  • Design pressure and temperature
  • Ambient and site conditions
  • Plot, weight and access constraints
  • Documentation and certification

Engineering intent

What this line is built to do.

01

High separation efficiency

02

Long loading time

03

Low weight

04

Sectioned internal distribution

Areas of application

Typical placements for this line. Final suitability is confirmed against the site conditions and the project specification.

LNGBasic chemicalsPharmaSpeciality chemicals

Series & variants

3 series. Three planning sizes each.

Series entries define the configuration route. The tables are representative planning grids, not certified performance data. Project-specific ratings, dimensions and connections are issued on the datasheet.

NX-PT-069

High Pressure

Pressure desublimator

Pressure desublimatorDemanding gas streamsHigh separation duty
ModelSurface areaPressure classMaterialPart number
NX-PT-069-S15 m²PN 25Duplex 2205NX-PT-069-S
NX-PT-069-M30 m²PN 40TitaniumNX-PT-069-M
NX-PT-069-L45 m²PN 100316LNX-PT-069-L

NX-PT-070

Mini

Compact desublimator

Compact desublimatorPilot or smaller streamsSpace-constrained systems
ModelSurface areaPressure classMaterialPart number
NX-PT-070-S30 m²PN 40TitaniumNX-PT-070-S
NX-PT-070-M45 m²PN 100316LNX-PT-070-M
NX-PT-070-L60 m²PN 16Duplex 2205NX-PT-070-L

NX-PT-071

Switch

Switch condenser

Switch condenserAlternating batch operationContinuous process support
ModelSurface areaPressure classMaterialPart number
NX-PT-071-S45 m²PN 100316LNX-PT-071-S
NX-PT-071-M60 m²PN 16Duplex 2205NX-PT-071-M
NX-PT-071-L75 m²PN 25TitaniumNX-PT-071-L

Representative planning grid · not for construction · certified data on project datasheet

General arrangement

Documentation

The line folder.

Datasheet, product overview and general arrangement are public. Certificates and material reports are issued against the order.

DocumentTypeScopeRevisionDateAction
Desublimators Datasheet2 pages · PDFDatasheetProcess Heat Transfer · DesublimatorsRev. 0401 Oct 2026PDF
Desublimators — Product Overview4 pages · PDFProduct overviewProcess Heat Transfer · DesublimatorsRev. 0401 Oct 2026PDF
Desublimators — General Arrangement1 page · PDFDrawingProcess Heat Transfer · DesublimatorsRev. 0301 Oct 2026PDF

Prefer the narrative version? The product overview includes the series ledger, application notes and the document index.

Open product overview

Process transfer / Desublimators

Send the duty point. We will return the fit.

The fastest route is a complete duty sheet: media, flow, temperatures, pressure, ambient, plot and documentation requirement. If the duty is still forming, send what you have and we will frame the questions.