NX-PT-075
Standard
Cost-efficient safety route
| Model | Surface area | Pressure class | Material | Part number |
|---|---|---|---|---|
| NX-PT-075-S | 15 m² | PN 25 | Duplex 2205 | NX-PT-075-S |
| NX-PT-075-M | 30 m² | PN 40 | Titanium | NX-PT-075-M |
| NX-PT-075-L | 45 m² | PN 100 | 316L | NX-PT-075-L |
Thermal equipment · Houston, USA · Since 2009
Leak-monitored double tube systems
Double-tube shell-and-tube exchangers for applications where accidental media mixing must be detected and prevented.

Product overview
Novaryn double-safety exchangers use a monitored path between inner and outer tube walls, allowing leak detection while keeping media separated for safer operation until planned maintenance.
Planning reference
Representative summary. Project duty, materials and certification are confirmed at selection.
Specification framework
The framework below is common to this line. It is not a substitute for a project datasheet: the final pressure class, material schedule, connection detail and test regime are fixed against the duty point.
01
02
03
Engineering intent
Safe media separation
Leak monitoring
High production availability
Environmental protection
Areas of application
Typical placements for this line. Final suitability is confirmed against the site conditions and the project specification.
Series & variants
Series entries define the configuration route. The tables are representative planning grids, not certified performance data. Project-specific ratings, dimensions and connections are issued on the datasheet.
NX-PT-075
Cost-efficient safety route
| Model | Surface area | Pressure class | Material | Part number |
|---|---|---|---|---|
| NX-PT-075-S | 15 m² | PN 25 | Duplex 2205 | NX-PT-075-S |
| NX-PT-075-M | 30 m² | PN 40 | Titanium | NX-PT-075-M |
| NX-PT-075-L | 45 m² | PN 100 | 316L | NX-PT-075-L |
NX-PT-076
Demanding requirement route
| Model | Surface area | Pressure class | Material | Part number |
|---|---|---|---|---|
| NX-PT-076-S | 30 m² | PN 40 | Titanium | NX-PT-076-S |
| NX-PT-076-M | 45 m² | PN 100 | 316L | NX-PT-076-M |
| NX-PT-076-L | 60 m² | PN 16 | Duplex 2205 | NX-PT-076-L |
NX-PT-077
Special application route
| Model | Surface area | Pressure class | Material | Part number |
|---|---|---|---|---|
| NX-PT-077-S | 45 m² | PN 100 | 316L | NX-PT-077-S |
| NX-PT-077-M | 60 m² | PN 16 | Duplex 2205 | NX-PT-077-M |
| NX-PT-077-L | 75 m² | PN 25 | Titanium | NX-PT-077-L |
Representative planning grid · not for construction · certified data on project datasheet
General arrangementDocumentation
Datasheet, product overview and general arrangement are public. Certificates and material reports are issued against the order.
| Document | Type | Scope | Revision | Date | Action |
|---|---|---|---|---|---|
| Shell & Tube Double Safety Datasheet2 pages · PDF | Datasheet | Process Heat Transfer · Shell & Tube Double Safety | Rev. 04 | 01 Oct 2026 | |
| Shell & Tube Double Safety — Product Overview4 pages · PDF | Product overview | Process Heat Transfer · Shell & Tube Double Safety | Rev. 04 | 01 Oct 2026 | |
| Shell & Tube Double Safety — General Arrangement1 page · PDF | Drawing | Process Heat Transfer · Shell & Tube Double Safety | Rev. 03 | 01 Oct 2026 |
Prefer the narrative version? The product overview includes the series ledger, application notes and the document index.
Open product overviewProcess transfer / Shell & Tube Double Safety
The fastest route is a complete duty sheet: media, flow, temperatures, pressure, ambient, plot and documentation requirement. If the duty is still forming, send what you have and we will frame the questions.