NOVARYNINDUSTRIAL LIMITED

Power & Energy / Grid / transformer cooling

Transformer cooling support for a renewable interconnect

Oil-air cooling route with lifecycle planning for a substation connecting wind generation to the transmission network.

Location
Aberdeenshire, United Kingdom
Year
2025
Families
Transformer cooling
Scope
Selection · supply · documentation
Substation transformer
Novaryn equipment referenceTX / US

The challenge

The transformer needed additional cooling capacity for summer peaks without changing the tank footprint. The site is exposed to coastal wind and salt, and the operator required access for fan replacement without taking the transformer out of service.

Project route

Approach

  • Review of oil flow, heat load and ambient design conditions.
  • Free-standing oil-air cooler with C5-M corrosion protection.
  • Fan and cooler segmentation for maintenance with the unit energised.
  • Noise review against the nearest residential receptor.
  • Spare fan and gasket package included in the order.

Result

  • Additional cooling capacity within the existing substation boundary.
  • Maintenance access independent of the transformer tank.
  • Corrosion class matched to the coastal environment.

Documents referenced

Transformer cooling brochure · Oil-air cooler datasheet · Installation manual

Case study / enquiry

Have a similar constraint?

Send the application, the fixed constraint and the duty point. We will tell you which family route is credible before a quotation is raised.