Transformer cooling support for a renewable interconnect
Oil-air cooling route with lifecycle planning for a substation connecting wind generation to the transmission network.
- Location
- Aberdeenshire, United Kingdom
- Year
- 2025
- Families
- Transformer cooling
- Scope
- Selection · supply · documentation

The challenge
The transformer needed additional cooling capacity for summer peaks without changing the tank footprint. The site is exposed to coastal wind and salt, and the operator required access for fan replacement without taking the transformer out of service.
Project route
Approach
- Review of oil flow, heat load and ambient design conditions.
- Free-standing oil-air cooler with C5-M corrosion protection.
- Fan and cooler segmentation for maintenance with the unit energised.
- Noise review against the nearest residential receptor.
- Spare fan and gasket package included in the order.
Result
- Additional cooling capacity within the existing substation boundary.
- Maintenance access independent of the transformer tank.
- Corrosion class matched to the coastal environment.
Documents referenced
Transformer cooling brochure · Oil-air cooler datasheet · Installation manual
More applications
Another constraint, another route.
Data Centre / Heat rejection
Scalable cooling package for a high-density digital facility
Dry coolers, redundancy planning and plate-interface review for predictable thermal performance across a staged campus build.
Read caseFood & Beverage / Process cooling
Hygienic cooling loop for batch production stability
Serviceable exchangers and coil selections aligned to cleaning access, temperature control and production changeovers.
Read caseCase study / enquiry
Have a similar constraint?
Send the application, the fixed constraint and the duty point. We will tell you which family route is credible before a quotation is raised.