NOVARYNINDUSTRIAL LIMITED

Heavy Industry / Waste heat recovery

Waste-heat recovery from a continuous process line

Air preheater and economiser package recovering exhaust heat into process air and boiler feedwater.

Location
Upper Silesia, Poland
Year
2024
Families
Heating · Process transfer
Scope
Selection · supply · documentation
Industrial boiler and exhaust ductwork
Novaryn equipment referenceTX / US

The challenge

The plant wanted to reduce gas consumption without disrupting a continuous production schedule. The exhaust stream carried dust and the available space allowed only a short shutdown window.

Project route

Approach

  • Heat balance and fouling review across the exhaust stream.
  • Air preheater with plain-tube section for the dirty duty.
  • Economiser sized for boiler feedwater heating.
  • Modular delivery and pre-assembled sections for the shutdown window.
  • Cleaning access and inspection points agreed with maintenance.

Result

  • Recovered heat returned to process air and feedwater.
  • Installation completed within the planned shutdown.
  • Cleaning access retained without removing the ductwork.

Documents referenced

Heating solutions brochure · Air preheater datasheet · Economiser overview

Case study / enquiry

Have a similar constraint?

Send the application, the fixed constraint and the duty point. We will tell you which family route is credible before a quotation is raised.